units
MRE5004
Faculty of Engineering
This unit entry is for students who completed this unit in 2016 only. For students planning to study the unit, please refer to the unit indexes in the the current edition of the Handbook. If you have any queries contact the managing faculty for your course or area of study.
Refer to the specific census and withdrawal dates for the semester(s) in which this unit is offered.
Faculty
Coordinator(s)
Offered
Asset operations optimisation (also called total productive maintenance), reliability driven maintenance (also called reliability centred maintenance), designing for operability and maintainability (including Hazops and the Bretby maintainability index analyses) and value methodology.
This unit will develop:
It will cover key areas of asset management requirements:
4 project based assignments
150 hours of study
See also Unit timetable information