units
CIV5261
Faculty of Engineering
This unit entry is for students who completed this unit in 2013 only. For students planning to study the unit, please refer to the unit indexes in the the current edition of the Handbook. If you have any queries contact the managing faculty for your course or area of study.
To find units available for enrolment in the current year, you must make sure you use the indexes and browse unit tool in the current edition of the Handbook.
Level | Postgraduate |
Faculty | Faculty of Engineering |
Organisational Unit | Department of Civil Engineering |
Offered | Clayton Second semester 2013 (Off-campus) |
Coordinator(s) | A Haque, A Ladson |
The unit will introduce the factors causing or aggravating flooding in the Australian context, the benefits and impacts of flooding and the risk management framework applied to reduce flooding and its impacts on the community. It will then cover the hydrologic background for estimating floods including flood frequency analysis and rainfall-based flood estimation methods. Students will use industry-standard computer software based on the hydrological and hydraulic computation methods. A number of measures to reduce flooding and its impacts, including flood mapping, planning controls, design of structural flood mitigation measures and emergency management measures are introduced.
The objectives of the unit are to:
Assignments: 50%
Examination (3 hours): 50%.
Students are required to achieve at least 45% in the total continuous assessment component (assignments, tests, mid-semester exams, laboratory reports) and at least 45% in the final examination component and an overall mark of 50% to achieve a pass grade in the unit. Students failing to achieve this requirement will be given a maximum of 45% in the unit.
150 hours study
150 hours study