units

CIV5262

Faculty of Engineering

Skip to content | Change text size
 

print version

Monash University

Monash University Handbook 2011 Postgraduate - Unit

6 points, SCA Band 2, 0.125 EFTSL

Refer to the specific census and withdrawal dates for the semester(s) in which this unit is offered.

LevelPostgraduate
FacultyFaculty of Engineering
OfferedClayton First semester 2011 (Off-campus)
Coordinator(s)A Deletic, T Fletcher

Synopsis

The unit first examines the general planning issues of integrated urban catchment management followed by an overview of current best management practices in stormwater management. Issues associated with the multiple objective management of urban stormwater will be discussed in detail. Students will gain sufficient appreciation of the management issues and current available technologies to formulate a stormwater management strategy for catchments with pre-specified environmental conditions and development characteristics. The unit is also aimed at providing students with hands-on experience in the design of some of the commonly used stormwater management measures.

Assessment

Assignments: 50%. Examination 50%. Students must pass both components.

Chief examiner(s)

Professor Xiao-Ling Zhao

Contact hours

150 hours work