[an error occurred while processing this directive]
|
|||||||||
GSE3204Construction practice(ENG)
C Medhurst 4 points + 26 lecture hours and 26 tutorial/field trip hours + Second semester + Gippsland + Prerequisites: GEG2313 or GSE2201, GEG2323 or GSE2202 + Prohibitions: GEG3353 Synopsis: Plant and equipment: compressed air services, excavating tools, rock drilling tunnel plant, hoisting and conveying equipment, concreting plant, form work, scaffolding welding, selection of plant, safety. Construction methods: preliminary works, drilling and blasting, open excavation, shafts and tunnels, preparation of foundations, piled foundations, timber and concrete construction, steel structures, prestressed concrete, roads and runways, dams, bridges, harbour and river works, estimating materials and costs. Assessment: Examination: 60% + Assignments: 40% |
Australian Government Requirements for International Students - CRICOS Provider Number: 00008C
Copyright © 1994-2001 Monash University - Last Date Modified: 20 June 2003 - Caution - Privacy Monash University ABN 12 377 614 012 |