[an error occurred while processing this directive]
Home Monash Info News and Events Campuses and Faculties Monash University
Monash University Handbooks

CHE5173

Cogeneration and site utility systems

(ENG)

4 points + 26 hours lectures and tutorials + First semester + Distance + Clayton, Malaysia

Synopsis: Steam systems: Heaters, traps, boilers, steam and gas turbines, distribution. Top level analysis: Path analysis; efficiency of heat flow paths; application to title site retrofit; Site composite curves: Total site source/sink profiles; site composite and utility grand composite curves. Retrofit: Analysis and optimisation of utility systems; steam level switching. Optimising steam levels: Minimising fuel consumption and operating costs. Gas turbine integration: Heat recovery systems. Refrigeration systems: Compression and absorption refrigeration; energy analysis for low temperature systems. Selection of drivers for process equipment. Site heat-to-power ratio.

Assessment: Examination: 100%


Help | Contacts | Site Map | Staff Directory | Search