CSE4849

Introduction to computer-integrated manufacture

Not offered in 1999

3 points - 2 hours per week - First, second semester - Clayton - Prerequisites: DGS6300

Synopsis The effect of NCNC part programming, material requirement planning, shop-floor control and product scheduling, computer-assisted inspection and quality testing.

Back to the 1999 Information Technology Handbooks