units
MNE4060
Faculty of Engineering
This unit entry is for students who completed this unit in 2015 only. For students planning to study the unit, please refer to the unit indexes in the the current edition of the Handbook. If you have any queries contact the managing faculty for your course or area of study.
Refer to the specific census and withdrawal dates for the semester(s) in which this unit is offered.
Level | Undergraduate |
Faculty | Faculty of Engineering |
Offered | Clayton First semester 2015 (Day) Clayton Second semester 2015 (Day) |
Coordinator(s) | Dr Mohan Yellishetty |
This unit is intended to build on the body of knowledge developed in MNE4050. The full year project is meant to be challenging and result in an in depth understanding of a topic in a particular area related to mining engineering. This unit must be taken with MNE4050 Research Project I to form a full year project. The decision must be made at the time of choosing the project topic for MNE4050. Students must undertake an individual self-guided learning task in the form of a research project. The emphasis will be more on data gathering, analysis and modelling as appropriate to the project topic. The result will be a technical paper suitable for a mining conference such those hosted by the Australasian Institute of Mining and Metallurgy (AusIMM), the professional association for Mining Engineers in Australia. The project may be undertaken within the department or externally within a company. In either case, an academic member of staff will act as the supervisor.
At the conclusion of this unit, students should be able to:
Practical work (conference paper and seminar presentation): 100%
One hour of consultation with supervisor per week and 11 hours per week working on the project.
See also Unit timetable information
MNE4050 Research Project I
None
None