Coordinator(s) | Professor Jerry Tien |
This unit provides the principles of overall planning, development and operating of an underground operation. Cost effective mining methodology: room-and-pillar, sublevel open stopping, vertical crater retreat, shrinkage, sublevel caving, longwall, etc. Auxiliary operations and selection of mine equipment for underground mining operations; optimization of mine performance.
At the conclusion of this unit, students will be able to:
Assignment/Practical/Project work (continuous assessment): 50%
Closed Book Examination (3 hours): 50%
Students are required to achieve at least 45% in the total continuous assessment component (assignments, tests, mid-semester exams, laboratory reports) and at least 45% in the final examination component and an overall mark of 50% to achieve a pass grade in the unit. Students failing to achieve this requirement will be given a maximum of 45% in the unit.
3 hours lectures, 2 hours practice class and 7 hours private study per week