CIV5311
Faculty of Engineering
This unit entry is for students who completed this unit in 2012 only. For students planning to study the unit, please refer to the unit indexes in the the current edition of the Handbook. If you have any queries contact the managing faculty for your course or area of study.
Refer to the specific census and withdrawal dates for the semester(s) in which this unit is offered, or view unit timetables.
Level | Postgraduate |
Faculty | Faculty of Engineering |
Offered | Clayton First semester 2012 (Off-campus) |
Coordinator(s) | A Haque, T Richardson |
This unit is an introduction to the principles and methods of project management as applied in various engineering and infrastructure projects. It is designed to be immediately applicable to physical and non-physical projects at a small and medium scale, and to provide a framework on which project management skills for large-scale projects can be developed. Classical project management techniques are covered with a special emphasis on dealing with risk in projects.
The objectives of the unit are to:
Assignments: 50%
Examination (3 hours): 50%.
Students are required to achieve at least 45% in the total continuous assessment component (assignments, tests, mid-semester exams, laboratory reports) and at least 45% in the final examination component and an overall mark of 50% to achieve a pass grade in the unit. Students failing to achieve this requirement will be given a maximum of 45% in the unit.
150 hours study