6 points, SCA Band 2, 0.125 EFTSL

LevelUndergraduate
FacultyFaculty of Engineering
OfferedClayton Second semester 2010 (Day)
Sunway Second semester 2010 (Day)
Coordinator(s)T Czaszejko

Synopsis

The unit begins by considering electrical machines, looking at DC machines, induction motors, synchronous motors and other types of motors under fixed and variable speed operation. Then thyristor rectifiers and switched power converters are presented, looking at their use for electrical energy conversion in general and variable speed motor control in particular. Finally, single and three phase AC networks, power factor correction, and electrical power generation, transmission and distribution networks are explored. Particular focus is given here to three phase transformers, transmission line modelling, quality of electrical supply, electrical protection systems, and power system control.

Objectives

To explore electrical power equipment, apparatus and systems. To understand the conversion of electrical energy into alternative forms for different load requirements. To understand electrical power generation, transmission and distribution systems.

Assessment

Continuous assessment: 30%
Examination: (3 hours): 70%. Students must achieve a mark of 45% in each of these two components to achieve an overall pass grade.

Chief examiner(s)

Professor Arthur Lowery

Contact hours

3 hours lectures, 3 hours laboratory and practice classes and 6 hours of private study per week

Prerequisites

ECE2061 and (ECE2031 or ECE2062)

Prohibitions