Gippsland First semester 2008 (Day)
Gippsland First semester 2008 (Off-campus)
Gippsland Second semester 2008 (Day)
Gippsland Second semester 2008 (Off-campus)
In general, students select a project that involves all aspects of the system development lifecycle; analysis and design, programming, testing and implementation of a solution. Project management aspects of system development are stressed, with the following deliverables required: proposal, definition, feasibility study, project plan, system specification, design report, implementation plan, user documentation, and operational software, to ensure that the project is delivered on time. The student must display a sense of responsibility for the project outcomes and skills for interaction with the client. Requirements include oral presentation(s) to the client and written reports.
Practical work, project reports, documents and other project deliverables, two presentations and the project supervisor's report
Completion of all core units
GCO2819, GCO9800, GCO3700, GCO3800, GCO3819, GCO3900, SYS3030, SYS3550, SYS3500