Skip to content | Change text size

GCO9800 - Industry Project

6 points, SCA Band 2, 0.125 EFTSL

Postgraduate Faculty of Information Technology

Leader: S Teng

Offered

Gippsland First semester 2007 (Off-campus)
Gippsland Second semester 2007 (Off-campus)

Synopsis

In general, students select a project that involves all aspects of the system development lifecycle; analysis and design, programming, testing and implementation of a solution. Project management aspects of system development are stressed, with the following deliverables required: proposal, definition, feasibility study, project plan, system specification, design report, implementation plan, user documentation, and operational software, to ensure that the project is delivered on time. The student must display a sense of responsibility for the project outcomes and skills for interaction with the client. Requirements include oral presentations to the client and written reports.

Assessment

Practical work (project reports, documents and other project deliverables, two presentations and the project supervisor's report: 100%

Prerequisites

GCO9804

Prohibitions

CSE9020