Undergraduate Faculty of Information Technology

Leader: S Teng

Offered

Gippsland First semester 2007 (Day)
Gippsland First semester 2007 (Off-campus)
Gippsland Second semester 2007 (Day)
Gippsland Second semester 2007 (Off-campus)
Hong Kong CID First semester 2007 (Off-campus)
Hong Kong CID Second semester 2007 (Off-campus)
Malaysia First semester 2007 (Day)
Malaysia Second semester 2007 (Day)
Singapore First semester 2007 (Off-campus)
Singapore Second semester 2007 (Off-campus)

Synopsis

Students work in groups on a project development for a client who may be either internal or external to Monash. Projects involve all aspects of the system development lifecycle but focus more heavily on project feasibility study and analysis and project management. Requirements are fulfilled by producing an identified set of deliverables, like project proposal, plan, a specification and user documentation. The team must ensure that the project is delivered on time. Each member of the team must demonstrate a significant contribution to the team effort, and display a sense of responsibility for the project outcome. The school's industry experience scheme fulfils the unit requirements.

Objectives

  1. understand all stages of the process of developing an information system;
  2. understand the roles and responsibilities of clients, system users and developers in a systems development project;
  3. understand how information systems are developed;
  4. the capacity to apply, in a practical setting, the theoretical work covered in their course.
  5. the ability to develop a significant computing application, from the analysis and design stages, through coding and implementation to evaluation.
  6. work with clients and communicate effectively with them
  7. define a problem, and gather data, facts, opinions and information needed to analyse and solve it.
  8. outline and evaluate alternative solutions to a system development problem.
  9. perform a feasibility study that includes estimates of costs, time requirements, a schedule for the development, and the benefits expected from the system.
  10. identify hardware and software requirements for a system.
  11. document a system design using tools which include system flow charts and data flow diagrams.
  12. implement a system, including testing and debugging.
  13. evaluate a system, identifying any weakness or possible enhancements.
  14. the ability to operate effectively as a member of a development team.

Assessment

Assignments:100%

Prerequisites

All first and second -year core units

Prohibitions

GCO2819, GCO3819, GCO3700, GCO3800, GCO3900, GCO3800A, CPE3200, CPE3300, CSE3200, IMS3000, (Translation set:GCO3800A)