Development of offshore oil and gas fields
Next offered in 1995
P Grundy
6 points * Irregular availability * Clayton
Well completion: free flow, acidising, subsea completion. Production phenomena: maximum efficient rate, simulation, productivity index, material balance, life expectancy, secondary recovery, gas production, economic and regulatory factors. Site parameters. Development options: review of floating and fixed production systems, satellites, manning, topsides. Case studies.
Assessment
Examinations (3 hours): 50% * Practical work/Seminar participation: 50%